BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Milan, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

As of October 28 2022, the project is in the community outreach phase and A Planning an Environmental Linkages study is underway. Study completion is expected late 2023. A firm construction schedule has not been established. Phase I engineering services are required for the preparation of a Combined Design Report and an Environmental Impact Statement (EIS) for the structure that carries I-80 over the Mississippi River. District Two together with the Iowa Department of Transportation are currently developing a Planning and Environmental Linkages (PEL) study. Findings from this corridor study will be incorporated into this Phase I project. It is possible that the proposed improvements may include total replacement and widening of the structure and may be on new alignment. Various alternates will be studied to determine the most viable solution for this corridor. Impacts to the interchanges of I-80/IL 84 (IL side), which also crosses the Canadian Pacific (CP) Railroad, and I-80/US 67 (IA side) may need to be explored, along with other existing interchange locations as the project develops. Consideration should be given to the scenic overlook, as well as pedestrian and bicycle accommodations. Phase I tasks may include the preparation of Bridge Condition Report (BCR), Type Size Locations (TSL) drawings, SGRs/Geotechnical investigations, Value Engineering (VE) Study, Interchange Type Study (ITS), Intersection Design Studies (IDS), Traffic Management Analysis (TMA), Subsurface Utility Engineering (S.U.E.), remove/replace culverts, perform bathymetric survey, coordinating/conducting public involvement activities, including facilitating two virtual/public meetings, preparation of public meeting exhibits and graphic displays, preliminary cost estimates, cross sections, typical sections, a vessel collision study, traffic modeling and capacity analysis, preparation of ROW documents and related work. The completion date for this contract will be 36 months after authorization to proceed. The prime firm must be prequalified in the following category to be considered for this project: Location Design Studies (New Construction/Major Reconstruction) Structures (Major River Bridges) Statements of Interest, including resumes of the key personnel noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 19 - RFQ Engineering - I-80 over the Mississippi River Corridor, Phase I Engineering Services and EIS

Design

Roads / Highways

$245,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
53
Bidding Soon
969
All Active Projects
406
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 3, 2024

August 27, 2024

img_map_placeholder

Interstate 80, Milan, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.