BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2021 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Fountain Valley, California. Completed plans call for site work for a water / sewer project.

**As od June 9, 2021, this project has not yet been awarded. It is expected to be awarded on 6/23/2021. The project will repair PVC liner failures within a 6,000 foot section of the 54" - 78" RCP Sunflower and Red Hill Interceptors. Included in this section are three siphons that require similar repair. The Project will require daily traffic control set ups/tear downs, man-entry of active sewers, temporary diversions, and bypass pumping, all to be performed at night, during low flows. The Project will also pour concrete to form a flat bottom inside the pipe to artificially keep low flows above the area of exposed concrete where the 270-degree PVC lining stops. Written questions regarding details of this IFB will be accepted (i.e., must be received) by OCSD until 5:00 P.M. (Pacific Time Zone), March 29, 2021. Written questions must be sent to the attention of Clarice Marcin, Senior Contracts Administrator at Contracts, Purchasing & Materials Management Division of the Orange County Sanitation District by email at construction@ocsd.com. All questions submitted shall contain the following title in the Subject line: "PROJECT NO. 7-66: Bidder Questions." All questions submitted shall be submitted in accordance with the requirements set forth in the Instructions to Bidders in the section entitled "Bidders' Questions Submitted By Electronic Mail." Telephone questions will not be accepted. Any questions received after this date may not receive a response. Project located at Bristol Street and Sunflower Avenue to Red Hill Avenue and MacArthur Blvd. through the Cities of Irvine, Costa Mesa and Santa Ana. The project will repair PVC liner failures within a 6,000 foot section of the 54" - 78" RCP Sunflower and Red Hill Interceptors. Included in this section are three siphons that require similar repair. The Project will require daily traffic control set ups/tear downs, man-entry of active sewers, temporary diversions, and bypass pumping, all to be performed at night, during low flows. The Project will also pour concrete to form a flat bottom inside the pipe to artificially keep low flows above the area of exposed concrete where the 270-degree PVC lining stops

Award

Water / Sewer

$4,777,000.00

Public - County

Site Work

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
717
Active Projects
356
Bidding Soon
3,581
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2021

June 14, 2021

Project location map

Multiple Locations, Fountain Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.