Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 2, 2021 at 8:00 PM
Updated March 16, 2024
Site work for a water / sewer project in Phoenix, Arizona. Working plans call for site work for a water / sewer project.
As of August 2, 2021, an engineer and construction manager have been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: The design and construction for these projects includes, but are not limited to: 7A-ES1 New Reservoir Project o Storage Capacity: up to five million gallons o Material: Concrete o Reservoir recirculation system o Reservoir aeration system o Provisions for future chlorination facility o Provisions for a future 9A Booster Pump Station o New electrical service, including secondary electrical and instrumentation o Site development, including perimeter security wall, entrance gate(s), on-site drainage retention, half-street improvements to Forest Pleasant Place and Cave Creek Road, and landscaping 7A New Watermain Project o Size: up to 42-inch o Length: approximately 9,300 Lineal Feet o Tie-in to existing 48-inch Zone 7A main o Tie-in to new 7A-ES1 reservoir inlet piping o Cathodic protection
Pre-Construction/Negotiated
Water / Sewer
$433,751.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2020
September 6, 2021
To Be Determined, Phoenix, AZ
Related To This Project
Phoenix, AZ
Bid Date: Aug 09 2019
Phoenix, AZ
Bid Date: Jul 17 2019
Phoenix, AZ
Bid Date: May 29 2019
Phoenix, AZ
Bid Date: Jul 22 2019
Phoenix, AZ
Bid Date: Jul 10 2019
Phoenix, AZ
Bid Date: Jul 31 2019
Phoenix, AZ
Bid Date: Mar 24 2021
Phoenix, AZ
Bid Date: Apr 21 2021
Phoenix, AZ
Bid Date: Jul 07 2021
Phoenix, AZ
Bid Date: Jun 21 2021
Phoenix, AZ
Bid Date: Apr 09 2021
Phoenix, AZ
Bid Date: May 12 2021
Phoenix, AZ
Bid Date: Apr 09 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
