Demolition, renovation and addition to an educational facility in San Diego, California. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for the renovation of a educational facility.

As of February 29, 2024, this project was completed in March 2023. No additional information is expected. The Work shall be conducted in 7 phases, with each phase substantially complete as indicated: 1. Phase 1: Install Temporary Relocatable Classrooms. Work of this phase shall commence after the Notice to Proceed and be substantially complete and ready for occupancy within 30 days after the Notice to Proceed. Work in existing buildings to commence except at the Kitchen. 2. Phase 2: Move Furniture and Equipment into Temporary Portable Classrooms and Demolish Existing Portable Classrooms. Work in existing buildings except the Kitchen to continue. 3. Phase 3: Construct Two-Story Classroom Building. Building to be ready for occupancy within twelve months after start of construction. 4. Phase 4: Move Furniture and Equipment from the three Kindergarten Portable Classrooms into three Temporary Relocatable Classrooms. Demolish the three Portable Kindergarten Classroom Buildings. 5. Phase 5: Install Three Kindergarten Portable Classroom Buildings. Buildings to be ready for occupancy within two months after start of this phase. 6. Phase 6: Remove Temporary Relocatable Classroom Buildings. Work of this phase shall commence upon completion of Phase 5, and be completed within one month. 7. Phase 7: Kitchen. Work of this phase shall commence and be completed during the Summer Break. 8. The remaining Work shall be substantially complete and ready for occupancy at time of Substantial Completion for the Work. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Occupancy

Educational

$3,000,000.00

Public - City

Addition, Demolition, Renovation

404

39

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
26
Bidding Soon
695
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2020

April 1, 2021

img_map_placeholder

7270 Lisbon St, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.