BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2024 at 8:00 PM

Updated July 25, 2024

Site work and paving for a road / highway in Auburn, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

*Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. The major items of work include a new traffic signal at the intersection of A Street NW and 10th Street NW and modify the channelization as needed for the new signal. The intersection is currently stop-controlled on the 10th Street NW approach. The project is needed to address a level of service deficiency at the intersection. New ITS equipment and Fiberoptic Cabling will be required to connect to the signal at A St SW and 3rd St SW . The proposed bid range for the project is from $750,000 to $1,100,000. The entire project, including cleanup, shall be physically completed within 40 working days. The project is funded with the City of Auburn monies. All bid proposals shall be accompanied by a bid deposit in cash, certified check, cashier’s check or proposal bond (surety bond) in an amount equal to five percent (5%) of the amount of such bid proposal Disadvantaged, Minority, and Women’s Business Enterprises are encouraged to respond. The City of Auburn does not discriminate on the grounds of race, color, religion, national origin, sex, sexual orientation, age or handicap in consideration for a project award The proposed bid range for the project is from $750,000 to $1,100,000. The entire project, including cleanup, shall be physically completed within 40 working days. The project is funded with the City of Auburn monies The City reserves the right to reject any and all bids, waive technicalities or irregularities and to accept any bid if such action is believed to be for the best interest of the City of Auburn.

Bid Results

Roads / Highways

$516,622.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
91
Bidding Soon
1,491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 26, 2024

Project location map

10th St NE & A St NE, Auburn, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.