Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Auburn, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
**As of March 27, 2023, project was awarded to Trucking & Excavating Inc, awarded amount is $1,689,653.33.** Th.e major items of work. include roadway and non-motor-ized improvements of Riverwalk Drive SE between Howard Road and Auburn Way South includ-ing site preparation and demoli-tion, constructing new pavement surfacing, new sidewalk, curb and gutter, curb walls, stormwa-ter conveyance, non-City utility coordination, permanent signing illumination., REF B, traffic con-trol and staging and all other work. The anticipated Notice to Proceed Date is March, 3, 2023 to accommodate a contract provided road clo-sure of Riverwalk Drive SE between Auburn Way South and Howard Road from March 6, 2023 to May 16, 2023. The Contract includes a monetary incentive to complete specific contract work on Riverwalk Drive SE during the closure. The proposed bid range for the project is from $1,900,000 to $2,100,000. The entire project, including cleanup, shall be physi-cally completed, within 125 work-ing days. This project is fund-ed by City of Auburn Capital Improvement Fund, WSDOT Pedestrian and Bike Safety Grant (non-Federal) and Muckleshoot Indian Tribe Funding Sources. All bid proposals shall be accompanied by a hid deposit in cash, certified check, cashier's check or proposal bond (surety bond) in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such Contract and furnish satisfactory Contract Bond within the time stated in the Bid Documents, the bid depos-it shall be forfeited to the City of Auburn. Disadvantaged, Minority, an.d Women's Business Enterprises are encouraged to respond. The City of Auburn does not discriminate on the grounds of race, color, religion, national origin, sex, sexual orien-tation, age or handicap in consid-eration for a project. award. The City reserves the right, to reject any and all bids, waive tech-nicalities or irregularities and to accept any bid if such action is believed to be for the best interest of the City of Auburn, *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$1,689,653.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2023
March 3, 2023
Riverwalk Dr SE, Auburn, WA
Related To This Project
Auburn, WA
--
Auburn, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.