Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an educational facility in State College, Pennsylvania. Completed plans call for the construction of a 105,000-square-foot, four-story above grade, one-story below grade educational facility.
TC19 Metal Panels, Louvers, Miscellaneous Envelope TC22 Building & Tunnel Plumbing/Equipment TC23 Building & Tunnel HVAC Piping & Equipment, Testing & Balancing The PSU College of Engineering Research & Teaching Space 2 Building (West 2) is a multi-story (4-story plus a basement) 105,000 gross square foot facility with an estimated construction value of $63M. The building will be attached to the new West Deck parking deck, which will be constructed first, however, the West 2 construction schedule will overlap with the parking deck project for several months of concurrent construction. The West 2 Building will be Penn State University's new Engineer's Toolbox with a high-bay research space housing multiple College of Engineering programs including: The School of Engineering Design, Technology, and Professional Programs (SEDTAPP); the Learning Factory; the Factory for Advanced Manufacturing Education (F.A.M.E.) Lab; and some research components of Architectural Engineering and Civil & Environmental Engineering. The building space will consist of teaching and research space, general purpose classrooms (GPC's), offices, conference space, a computational computer lab, and "build" studios in a highly collaborative environment showcasing "engineering on display". This new, modern, iconic landmark building will be visitors' introduction to the College of Engineering as the starting place for recruiting and orientation tours and home for all first-year engineering students. West 2 will have a two 48-seat active learning General Purpose Classrooms on the lower level, as well as several studio spaces for engineering design. The "build" spaces, wood and metal shops, and "Learning Factory" will be areas where students learn about and utilize tools and machinery such as welding, 3D printing, and laser cutting. The research high-bay area, located between the main West 2 building and the West Parking Deck, will consist of a 25' x 60' reaction floor and 30' high reaction walls to enable testing forces from multiple directions. West 2 features Cross Laminated Timber (CLT) decking currently cutting edge in the United States construction industry. Rather than a tradition slab on metal deck building, this building will have steel beams and columns, with a timber deck and concrete topping slab. The CLT decking is also a fitting design compliment to the wood curtain wall system with triple-pane glazing to enhance the thermal comfort along the building's expansive east facing facade viewing the re-design quad. The duration of the multi-prime contract construction period is scheduled for 23 months, from October 2020 to August 2022. Bid Results TC19 :: Mohawk Construction & Supply :: $2,265,627.00 TC22 :: Wayne Crouse, Inc. :: $2,711,000.00 TC23 :: Wayne Crouse, Inc. :: $7,388,000.00
Bid Results
Educational
$12,364,627.00
Public - State/Provincial
LEED Certification, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2020
October 1, 2020
W Campus Dr, State College, PA
Related To This Project
State College, PA
Bid Date: Jul 09 2020
State College, PA
Bid Date: Jul 27 2021
State College, PA
Bid Date: Jul 07 2021
State College, PA
Bid Date: Aug 24 2021
State College, PA
Bid Date: May 27 2021
State College, PA
Bid Date: Mar 18 2019
State College, PA
Bid Date: May 21 2021
State College, PA
Bid Date: Jan 12 2022
State College, PA
Bid Date: Sep 14 2023
State College, PA
Bid Date: Oct 03 2023
State College, PA
Bid Date: Sep 26 2023
State College, PA
Bid Date: Sep 21 2023
State College, PA
Bid Date: Sep 26 2023
State College, PA
Bid Date: Sep 21 2023
State College, PA
Bid Date: Sep 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.