BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Millbury, Massachusetts. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Location: Millbury Project Type: Bridge - Construction MassDOT - Superstructure Replacement and Related Work Bridge Number M-22-038 (Steel) Along a Section of Interstate 90 at Interchange 11 The participation goals for this project shall be 15.3% for minorities and 6.9% for women. All work under this Contract shall be done in conformance with the 2020 Standard Specifications for Highways and Bridges, the Supplemental Specifications contained in this book, the 2017 Construction Standard Details, the Traffic Management Plans and Detail Drawings, the 1990 Standard Drawings for Signs and Supports; the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Massachusetts Amendments; the 1968 Standard Drawings for Traffic Signals and Highway Lighting; The American Standard for Nursery Stock; the Plans and these Special Provisions. Work under this Contract consists of the superstructure replacement of the I-90 Interchange 11 Bridge (MassDOT Bridge No. M-22-038) which carries Ramps A and B over I-90 in the Town of Millbury. The work includes the complete replacement of the existing four-span superstructure with a two-span continuous steel plate girder bridge. The work includes the partial replacement of the existing substructure with the demolition of the existing abutments and partial demolition of the existing North and South Piers. The new superstructure will be founded on two (2) new reinforced concrete abutments and the existing center pier, which will be reused and modified to support the new superstructure. The new abutments will be placed between the existing abutments and the two (2) existing first interior piers, increasing horizontal clearance under the bridge. The minimum vertical clearance over I-90 will be increased to 16'-6" by raising the I-90 Interchange 11 ramp profile. Approach roadways will be paved and a new concrete median and approach guardrail will be installed. I-90 Eastbound and Westbound will be milled and overlaid and a section of the existing concrete median barrier will be removed and replaced in the vicinity of the bridge as shown on the Plans. The existing highway lighting along all four (4) I-90 Interchange 11 ramps will also be replaced as shown on the Plans. There will also be minor drainage work included. The Contractor shall satisfy themselves by their own investigation and research as to conditions and measurements affecting the work to be done and shall make their bid in sole reliance thereon.

Award

Bridges / Tunnels

$9,113,324.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

220

1

9

7

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
654
Active Projects
397
Bidding Soon
5,284
All Active Projects
2,207
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 6, 2020

December 7, 2020

img_map_placeholder

I-90, Millbury, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.