BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Holmes Beach, Florida. Completed plans call for site work for a water / sewer project.

Q & A deadline: Jan 03, 2022 1:00:00 PM MST Construction Management at Risk Services Kingfish Boat Ramp Improvements- This project consists of seawall, dock, boat ramp, utility, parking, landscaping, stormwater and restroom building improvements to the existing Kingfish Boat Ramp. The proposed boat ramp will include concrete stabilized ramp and shoreline armor/propwash protection at the end of the ramp. The ramp will include four (4) individual launch lanes with finger docks separating each lane. The existing seawall will be replaced with new sheet pile and concrete sea wall. Additional docking is proposed for fishing, viewing, and boat staging along the seawall frontage and extending into Anna Maria Sound on the east and west terminals. Existing seagrasses have been identified on the plans and must be protected during construction. Existing parking lot will be reconfigured and improved with concrete paving, catch basins, and a stormwater management system. Stormwater management will include the addition of swales and two main ponds on the east and west ends of the property. FDOT gravity wall will be required in some areas of the parking lot adjacent to Anna Maria Sound. The stormwater management system will discharge into Anna Maria Sound via two (2) broad crested weirs. Utility improvements willinclude electric service via connection to the existing FP&L system for parking lot lighting, restrooms, and grinder pump station. Water utility improvements will include service to two (2) fish cleaning stations, restroom, ice vending, and irrigation water service. Sanitary sewer improvements will include approximately 2,500 feet of 3" HDPE force main from the proposed pump station to an existing manhole located within the SW 5th Avenue right-of-way. Landscaping improvements will consist of tree preservation/removal (Australian Pine, etc.), mangrove/shoreline protection, and plantings throughout the project site.

Post-Bid

Water / Sewer

$600,000.00

Public - County

Site Work

86

22

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
34
Bidding Soon
880
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2022

July 11, 2022

img_map_placeholder

752 Manatee Ave, Holmes Beach, FL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.