BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a fire / police facility in Saint Cloud, Florida. Working plans call for the remodel of a fire / police facility.

Project has been cancelled Remodel existing Logistics Building to provide adequate secure storage area for the Fire Department equipment and supplies. Add walls, kitchen, storage shelving, modify the HVAC system, change front door for security and new flooring. DEMOLITION 1. Remove walls as indicated on drawings. 2. Remove toilet room fixtures as indicated on drawings. 3. Remove tile floor in toilet room as indicated on drawings. 4. Remove service sink, to be reused. 5. Remove electrical panel box and wall mounted conduit as indicated on drawings. 6. Remove attic access panel and mounting trim as indicated on drawings. 7. Remove tile in office area as indicated on drawings. 8. Remove store front doors as indicated on drawings. 9. Dispose of all removed material in a safe and legal manner. NEW CONSTRUCTION 1. Install new electrical receptacles/data outlets as indicated on drawings. 2. Install new walls w/2x4 wood stud @16" O.C. w/batt insulation and 1/2 " gypsum board on both sides, tape, bed and paint. 3. Install vinyl curtain in cased opening in new wall. 4. Install new wall and door w/louvers at A/C closet as indicated on drawings. 5. Install new return air grill to match existing on back side of existing wall mounted return air grill as indicated on drawings. 6. Install ceiling gypsum board to match existing where the attic access was removed, tape, bed and paint to match existing ceiling. 7. Install new floor tile in kitchen and reception area, repair existing floor as needed, color and style by Architect. 8. Install new carpet tile in office area, color and style by Architect. 9. Install new 3'-6" base cabinet with 42" & 30" overhead cabinets as indicated on drawings. 10. Install new reception area counter as indicated on drawings. 11. Install new front doors as indicated on drawings. 12. Install salvaged service sink in toilet room as indicated on drawings. 13. Install new water closet and lavatory, (to match existing) in toilet room as indicated on drawings. 14. Install ADA hardware on new doors and existing exterior door. 15. Repair wall surface as needed and paint entire office area. Question End Date 8/25/2020 5:00 PM Start Date 10/01/2020

Final Planning

Fire / Police

$62,000.00

Public - City

Remodeling

7

12

13

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
61
Bidding Soon
1,222
All Active Projects
542
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2020

November 2, 2020

img_map_placeholder

3410 Old Canoe Creek Rd, Saint Cloud, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.