Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Auburn, Washington. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Auburn Environmental Park (AEP) provides vegetated natural open space within an urbanized area. The AEP provides opportunities for local economic development, water quality improvement, storm water detention, flood control, fish and wildlife enhancement, visual resources, public education, and passive recreation, including walking trails and bird viewing amenities. In 2012, the City completed the construction of approximately 1,200 lineal feet of the first phase (Phase 1) of an elevated boardwalk trail in the Auburn Environmental Park (AEP). This trail extended from West Main Street through existing wetlands in the AEP terminating at the base of the Bird Viewing Tower constructed in 2009. As part of the construction of the elevated boardwalk, the City also installed interpretative signage, bench seating, limited new vehicle parking on Western Avenue and over two acres of wetland species of trees, plants and shrubs. Phase 2 of the elevated boardwalk trail would construct a combination of up to approximately 2,000 lineal feet of surface trail and elevated boardwalk trail from the current terminus at the Bird Viewing Tower to a connection with the Interurban Trail. The Phase 2 project will further previous and current Councils visions of the AEP providing passive recreation and environmental education opportunities for all Auburn citizens. As of June 6, 2024, this project has been cancelled and there are not currently plans to move forward with it. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Project Abandoned
Sidewalks / Parking Lot
$800,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2024
To Be Determined, Auburn, WA
Related To This Project
Auburn, WA
--
Auburn, WA
Bid Date: Feb 08 2023
Auburn, WA
Bid Date: Jan 11 2023
Auburn, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.