BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chula Vista, California. Completed plans call for site work for a water / sewer project.

This Request for Quote (RFQ) is issued to cover the cost to the Authority for Roof Replacements at the Richard A. Reynolds Groundwater Desalination Facility. From this RFQ, the Authority will award and contract one service provider (Contractor). Sweetwater Authority encourages participation by local, small and/or disadvantaged businesses. The Service Provider shall provide all labor, supervision, materials, tools, equipment, and incidentals, including a portable restroom for use by the Service Provider. This work entails the installation of a Johns Manville single ply roof system; [TPO stands for thermoplastic polyolefin, a single-ply roofing membrane that covers the surface of the roof] over the existing standing seam metal roof. The existing clear translucent panels will be replaced with curb mount double dome acrylic skylights. Prep existing metal roof for membrane installation. o Install wood curbs for new curb mounted skylights. Raise existing curbs as needed for exhaust fans. o Fill in between standing seam ribs with 3" ISO insulation and cover with 1/4 " Securock cover board and mechanically with purlin screws and Rhino Plates. o Secure down Johns Manville 60 Mil. TPO by heat induction and heat weld laps. Color: White o Fully adhere TPO to inner gutters, parapet walls, and equipment curbs. Panels on parapet wall will be removed and saved for re-installation. o Install all necessary pipe boots, sealants, clamps, and accessories to form a leak proof roof. o Install TPO walk pad leading to exhaust fans, follow existing walk paths on current roof. o Replace all downspouts from roof top to drain on asphalt. o Clean up and haul away all roof related debris. o All workmanship shall be guaranteed for (2) years by service provider, and a (20) year, No Dollar Limit, (NDL) registered warranty by Johns Manville. The Service Provider shall provide all labor, supervision, materials, tools, equipment, and incidentals Question Deadline: 2:30 PM on September 1, 2020 Questions regarding Prevailing Wage should be directed to: Division of Labor Statistics and Research P.O. Box 420603 San Francisco, CA 94142-0603 Phone: (415) 703-4774 All questions concerning bid specification or scope of work must be submitted in writing either by mail, facsimile, or e-mail Sylvia McCain 744 F Street Chula Vista, CA 91910 Fax: (619)427-9574 Email: Purchasing@sweetwater.org Roof replacements will be at the Richard A. Reynolds Groundwater Desalination Facility located at 3066 North Second Ave., Chula Vista, CA 91910. Buildings in the scope of work are located at the same address Sweetwater Authority (Authority) is a publicly owned water agency that provides water service to approximately 197,000 people in National City, Bonita and the western and central portions of Chula Vista, California. All provisions of law applicable to public contracts will be made part of the final contract to the same extent as though set forth herein, and will be complied with by the successful bidder The Service Provider shall provide all labor, supervision, materials, tools, equipment, and incidentals, including a portable restroom for use by the Service Provider. This work entails the installation of a Johns Manville single ply roof system; [TPO stands for thermoplastic polyolefin, a single-ply roofing membrane that covers the surface of the roof] over the existing standing seam metal roof. The existing clear translucent panels will be replaced with curb mount double dome acrylic skylights. • Prep existing metal roof for membrane installation. • Install wood curbs for new curb mounted skylights. Raise existing curbs as needed for exhaust fans. • Fill in between standing seam ribs with 3” ISO insulation and cover with ¼” Securock cover board and mechanically with purlin screws and Rhino Plates. • Secure down Johns Manville 60 Mil. TPO by heat induction and heat weld laps. Color: White • Fully adhere TPO to inner gutters, parapet walls, and equipment curbs. Panels on parapet wall will be removed and saved for re-installation. • Install all necessary pipe boots, sealants, clamps, and accessories to form a leak proof roof. • Install TPO walk pad leading to exhaust fans, follow existing walk paths on current roof. • Replace all downspouts from roof top to drain on asphalt. • Clean up and haul away all roof related debris. • All workmanship shall be guaranteed for (2) years by service provider, and a (20) year, No Dollar Limit, (NDL) registered warranty by Johns Manville. The Service Provider shall provide all labor, supervision, materials, tools, equipment, and incidentals. The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs, including personal protective equipment, in connection with the performance of the services provided. The Authority’s Project Manager or designated representative from the Plant Maintenance staff will arrive on the job site at the start of a task and inspect as necessary for the desired outcome. If necessary, Sweetwater Engineering Inspectors will complete the inspection. Contractor shall give notices and comply with all applicable laws and regulations of any public body having jurisdiction for the safety of persons or property and to protect them from damage, injury or loss, and shall erect and maintain all necessary safeguards for such safety and protection

Award

Water / Sewer

$169,280.00

Public - City

Site Work

4

1

4

8

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
73
Bidding Soon
993
All Active Projects
491
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 9, 2020

October 1, 2020

October 31, 2020

img_map_placeholder

3066 N 2nd Ave, Chula Vista, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.