Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2020 at 8:00 PM

Updated September 15, 2023

Site work and paving for a sidewalk / parking lot in Liberty, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

For Ps&e Project Questions Call: Noel Salac 209 Layl Dr Liberty, Tx 77575 936/336-2244 Length: 2.5150 Mi Time for Completion: 60 Working Days County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Liberty 0028-03-110 Sh 146, East Us 90 Stp 2021(086) S.colbert St Length: 0.8060 Miles Liberty 0593-01-131 Dayton High School, South Sh 321 Stp 2021(086) Us 90 Length: 1.7090 Miles TXDOT - US 90 - Construct Pedestrian Infrastructure

Award

Sidewalks / Parking Lot

$1,094,436.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
181
Bidding Soon
3,917
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2020

December 2, 2020

Project location map

US-90, Liberty, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed