EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2020 at 8:00 PM

Updated September 15, 2023

Site work and paving for a bridge / tunnel in Early, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For Ps&e Project Questions Call: Bart Fris 2160 Cr 381 Brownwood, Tx 76802 325/643-0358 Length: 4.2090 Mi Time for Completion: 170 Working Days County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Brown 0923-06-077 Cr 120 at Red River Cr Br 2020(922) . Length: 4.1090 Miles Comanche 1039-02-096 at Holmsley Creek Fm 1476 Br 2b20(283) . Length: 0.10 Miles TXDOT - Replace Bridge and Approaches

Award

Bridges / Tunnels

$1,018,524.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Stressing Tendons, Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Grouting
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls, Earthwork Methods, Gabions, Gabion Mattresses
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
7
Bidding Soon
250
All Active Projects
103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2020

December 2, 2020

img_map_placeholder

Multiple Locations, Early, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.