Published July 12, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Milpitas, California. Completed plans call for site work for a water / sewer project.

Estimated budget: $3,100,000 to $3,300,000 This project extends approximately one mile from the north at its confluence with Coyote Creek to San Andreas Drive. The project will widen the channel, construct floodwalls and levees and replace the existing levees. Work will also involve removal and replacement wetlands. The estimated cost of the Project is $16 million to $21 million Project Description. The Project is being constructed to increase channel flood capacity and improve the ecology of the creek system. The scope includes the following: 1. Compliance with NPDES General Permit, including BMP Action Plan or Storm Water Pollution Prevention Plan preparation, installation of BMP, and implementing the approved SWPPP; 2.Compliance with the Project regulatory permits including the Lake and Streambed Alteration Agreement (CDFW), the Section 401 Water Quality Certification (SFBRWQCB), 404 Permit (USACE); 3.Compliance with the Project permits including City of Milpitas encroachment permit and Caltrans encroachment permit; 4.Site, noise and vibration monitoring; 5.Develop and implement traffic control for the Project for approval by the City of Milpitas; 6.Clearing and grubbing within the Project limits, including the removal of trees and vegetation (including existing wetland species), sacked concrete, channel concrete lining, rock riprap protection and other miscellaneous items identified in the Drawings; 7.Control of water; including proper diversion of upstream drainage and channel flows; diversion of downstream tidal flows; proper handling and disposal of groundwater flows that are byproducts of the required construction; 8.Channel excavation, including excavation, testing and disposal of unsuitable materials; excavation and disposal of existing levee materials; 9.Construction of a new levee and raising of existing levees; replacement of unsuitable materials; and reusing excavated materials; 10.Construction and surfacing of maintenance roads on top of the left and right bank levees (facing upstream); 11.Construction and surfacing of depressed maintenance road along the left bank (facing upstream) between California Circle and Milmont Drive, in the City of Milpitas, with aggregate base (AB) material; 12.Surfacing of top-of-bank maintenance access path on the inboard side of the floodwall with AB or concrete or asphalt concrete (AC), as shown on the Drawings; 13. Surfacing of top-of-bank maintenance access path on the outboard side of the floodwall with decomposed granite (DG) material; +1 312 626 6799 US (Chicago) Meeting ID: 379 605 4075. Find your local number: https://valleywater.zoom.us/u/aekffBkBma

Award

Water / Sewer

$18,602,320.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Exploratory Excavations, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices, Flags and Banners, Flags
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Mowing, Pruning, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Irrigation, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection, Waterway Construction and Equipment, Waterway Structures, Floodwalls
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
115
Bidding Soon
1,774
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Lower Penitencia Creek Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.