Site work and paving for a sidewalk / parking lot in Riverside, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project proposes to construct a concrete sidewalk on one side of Adair Avenue from Randolph Street to Jo Jo Way, and on one side of Bonita Avenue from Tyler Street to Pendleton Street in the City of Riverside. The project improvements include, but are not limited to, clearing and grubbing, excavation, construction and/or reconstruction of concrete curbs, gutters, sidewalks, wheelchair ramps, driveways, and installation of chain link fencing. Any questions pertaining to the items, specifications and/or scope of this bid should be directed to the Q&A tab before 4:00pm PDT on August 31, 2020. Bid Security in the form of a Bid Bond in the amount of 10% of the total bid must be uploaded prior to the hour and the date stated above. Bid Security in the form of a Cashier's check or Certified check must be submitted to the Purchasing Manager, at 3900 Main Street, Riverside, CA 92522, prior to the hour and the date stated above. Both bonds shall be in the amount of one hundred percent (100%) of the Contract Price and shall be subscribed by an Admitted Surety Insurer which is authorized to transact surety insurance business in the State of California with a policy holder's rating of A or higher and a Financial Class of VII or larger. This project is comprised of sidewalk improvements at two separate locations in the City, namely Adair Avenue from Randolph Street to Jo Jo Way, and Bonita Avenue from Tyler Street to Pendleton Street. The Contractor shall complete the work at each location within thirty (30) working days after the commencement date specified in the Notice to Proceed. The total contract duration shall be a maximum of sixty (60) working days should the Contractor decide to complete the work in one location prior to starting construction at the next location. The Contractor has the option of starting work at both locations, simultaneously, for a total contract duration of thirty (30) working days.

Award

Sidewalks / Parking Lot

$392,355.00

Public - City

Paving, Site Work

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
104
Bidding Soon
2,260
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2020

October 12, 2020

img_map_placeholder

Multiple Locations, Riverside, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.