Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2020 at 8:00 PM

Updated September 15, 2023

Site work and paving for a road / highway in Maynard, Massachusetts. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of September 23rd all bids have been rejected and the project will be re-advertised within the next 30-60 days for Spring 2021 paving. Contractor Qualification Highway Division The work consists of pavement mill and overlay on one (1) street and pavement reclamation with binder and surface courses on two (2) streets. Mill and Overlay: For mill and overlay sections, the contractor shall mill the existing pavement to a depth of 2", remove and dispose of the millings, machine pave a 2" surface course of bituminous concrete, and adjust manholes, gate boxes, and catch basins as necessary. The contractor shall also replace all existing pavement markings on repaved streets in kind. No line items are included for any required pavement markings in the Bid Sheets. The street to be treated with mill and overlay is: Nason Street - A 250' by 30' section of Nason Street (approximately #12 Nason to #42 Nason as marked out by DPW in the field prior to milling operations). Note: No vibratory roller will be allowed on this section of Nason Street during paving operations. *This project timeline has been extended due to the public health crisis.

Final Planning

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
837
Active Projects
384
Bidding Soon
5,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2020

October 19, 2020

Project location map

Multiple Locations, Maynard, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed