Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Milford Township, Minnesota. Completed plans call for the construction of a 34,000-square-foot service station / car wash facility; for site work for a service station / car wash facility; military facility; military facility; road / highway; and for paving for a road / highway.
This project has a Targeted Group (TG), Economically Disadvantaged (ED), Veteran Owned (VO) preference and a 4% TGB subcontracting goal established. Mechanical and Electrical Subcontractor Responses will be received until 2:00 p.m. on September 30, 2020. SUMMARY OF WORK: The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1) Construction of a new 34,000 square foot Vehicle Maintenance Shop located in the city of New Ulm, MN. The project location is 2100 Palmer Avenue, New Ulm, MN 56073. 2) Site work includes site preparation, site utility extensions, access drive construction,various pavement types including concrete, asphalt compacted gravel and site restoration and landscaping. 3) Building construction consists of architectural precast concrete wall panels, load bearing masonry, structural steel frame, steel joists and deck, structural precast concrete plank, concrete slab on grade, ethylene-propylene-diene-monomer EPDM) roofing, metal wall panel exterior finishes, aluminum window systems, translucent wall panel systems and other exterior and interior framing and enclosures with related finishes. The pre-bid meeting format will adhere to social distancing and other guidance https://www.health.state.mn.us/diseases/coronavirus/indes.html provided by the Minnesota Department of Health (MDH) and Center for Disease Control (CDC) in an effort to reduce the spread of COVID-19. Face coverings are required per Executive Order 20-81: https://mn.gov/governor/news/executiveorders.jsp. Attendees are responsible to bring their own face coverings. Prospective attendees exhibiting any cold or flu-like symptoms are asked not to attend.
Bid Results
Service Station / Car Wash
$10,840,000.00
Public - Federal
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2020
December 7, 2020
2100 Palmer Avenue, Milford Township, MN
Related To This Project
Milford Township, MN
Bid Date: Nov 09 2020
Milford Township, MN
Bid Date: Sep 24 2020
Forest Lake, MN
--
Minneapolis, MN
Bid Date: Feb 21 2022
Minneapolis, MN
Bid Date: Feb 21 2022
Rochester, MN
--
Redwood Falls, MN
--
Minneapolis, MN
--
Bloomington, MN
--
Bloomington, MN
--
Bloomington, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.