Published July 11, 2025 at 8:00 PM
Updated July 12, 2025
Site work for a water / sewer project in Milford Township, Minnesota. Completed plans call for site work for a water / sewer project.
Site Directions: Proceed 1.75 miles south on 541st Ave from intersection of County Road 5, turn east onto 422nd Street and proceed 0.70 miles, turn north onto gravel access road and proceed 0.50 miles to project site. Est. Completion Date: Aug. 29, 2026 Work will involve modifications to an existing pump station constructed to manage runoff for Nicollet County Ditch (CD) 86A The project improvements include the removal of an existing slide gate on the outlet (interior) of the pumping system vault structure, including removal of exterior (overflow) piping segments, capping of remaining pipe that penetrates exterior vault wall, and installation of a 2" discharge pipe mounted to the cap/cover. Installation of an 8'x8' stainless steel slide gate complete with an electric actuator on box culvert end section located at the inlet (exterior) of the pumping system vault structure and construction of structural support(s) and related modifications to the discharge piping to each of the systems three (3) discharge pumps. A separate construction project at the facility, involving improvements to the pump system control building, is anticipated to be completed in the Fall of 2025. Although conflicts for utilization of site area between the two (2) separate improvement projects are not anticipated, the project work per this contract may be completed commensurate with the pump system control building improvement project. Major work tasks associated with the pump system control building improvement project include: Installation of a post-frame building 19'x20' over the existing fiberglass control building structure Miscellaneous site grading (30 CY of imported materials) to establish positive grading adjacent the control building Relocation of control building HVAC appurtenances and miscellaneous electrical improvements to the exterior of the new control building enclosure
Award
Water / Sewer
$244,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
June 30, 2025
541st Ave & 422nd St, Milford Township, MN
Related To This Project
Milford Township, MN
Bid Date: Nov 09 2020
Milford Township, MN
Bid Date: Oct 07 2020
Milford Township, MN
Bid Date: Sep 24 2020
Minneapolis, MN
Bid Date: Jun 10 2025
Foley, MN
Bid Date: May 29 2025
Elmore, MN
Bid Date: May 12 2025
Baxter, MN
Bid Date: May 21 2025
Oakdale, MN
--
Mankato, MN
Bid Date: May 30 2025
Minneapolis, MN
--
Nashua, MN
Bid Date: May 15 2025
Northfield, MN
--
Coon Rapids, MN
Bid Date: May 15 2025
Onamia, MN
Bid Date: Jun 04 2025
Hutchinson, MN
Bid Date: May 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.