Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Site work for a water / sewer project in Milford Township, Minnesota. Completed plans call for site work for a water / sewer project.

Site Directions: Proceed 1.75 miles south on 541st Ave from intersection of County Road 5, turn east onto 422nd Street and proceed 0.70 miles, turn north onto gravel access road and proceed 0.50 miles to project site. Est. Completion Date: Aug. 29, 2026 Work will involve modifications to an existing pump station constructed to manage runoff for Nicollet County Ditch (CD) 86A The project improvements include the removal of an existing slide gate on the outlet (interior) of the pumping system vault structure, including removal of exterior (overflow) piping segments, capping of remaining pipe that penetrates exterior vault wall, and installation of a 2" discharge pipe mounted to the cap/cover. Installation of an 8'x8' stainless steel slide gate complete with an electric actuator on box culvert end section located at the inlet (exterior) of the pumping system vault structure and construction of structural support(s) and related modifications to the discharge piping to each of the systems three (3) discharge pumps. A separate construction project at the facility, involving improvements to the pump system control building, is anticipated to be completed in the Fall of 2025. Although conflicts for utilization of site area between the two (2) separate improvement projects are not anticipated, the project work per this contract may be completed commensurate with the pump system control building improvement project. Major work tasks associated with the pump system control building improvement project include: Installation of a post-frame building 19'x20' over the existing fiberglass control building structure Miscellaneous site grading (30 CY of imported materials) to establish positive grading adjacent the control building Relocation of control building HVAC appurtenances and miscellaneous electrical improvements to the exterior of the new control building enclosure

Award

Water / Sewer

$244,000.00

Public - County

Site Work

16

4

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
145
Bidding Soon
1,389
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

June 30, 2025

Project location map

541st Ave & 422nd St, Milford Township, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.