BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 28, 2025 at 8:00 PM

Updated April 29, 2025

Site work and paving for a sidewalk / parking lot in Concord, North Carolina. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project includes acquisition of site control, design and construction of the Clarke Creek Greenway, as part of the Cox Mill Loop. The full Loop includes Phases I, II & III of the greenway; coupled with connections to current and future multi-use path/side path along Cox Mill Road that will be constructed as part of private development, City sidewalk project(s), and/or future NCDOT expansion project(s). Phase I: 10-ft wide asphalt greenway trail running parallel to Clarke Creek from Falling Leaf Drive to Aragorn Lane in the Highland Creek neighborhood, including two direct neighborhood connectors to the neighborhoods via Aragon Lane and Elrond Drive. The project connects this mainline trail across Clarke Creek with two pedestrian boardwalk and bridge structures that connect to the Allen Mills neighborhood and the future J.E. 'Jim' Ramseur Park. The project totals 1.5 miles and includes: paved trail/boardwalk: $4,700,000; and two prefabricated truss bridges for $1,200,000. Phase II: 10-ft wide asphalt greenway trail connecting Phase I to Falling Leaf Drive and Millstream Ridge Drive, as well as a connection from Allen Mills neighborhood to Poplar Tent Road. The project includes a trailhead parking area on Cox Mill Road. The project totals 2.54 miles of greenway that will be paved trail and boardwalk. Phase III: 10-ft wide asphalt greenway replacing the existing trail along the Christenbury neighborhood, connecting Phase II parking trailhead to the Phase I and II trail. The project totals 1.32 miles that will include: paved trail/boardwalk: $2,150,000; and two prefabricated truss bridges: $400,000. As of January 7, 2025, this project is included in the City of Concord Fiscal Year 2025-2029 CIP. Further information regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Sidewalks / Parking Lot

$14,214,846.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
123
Bidding Soon
1,562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

Project location map

Multiple Locations, Concord, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.