BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Lilburn, Georgia. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project intends to install bicycle and pedestrian accommodations along the east side of Indian Trail Lilburn Rd from Beaver Ruin Rd to the Shelley Ln, just past the Camp Creek Trailhead. The estimated project length is 4.45 miles. The logical termini for this project is at Beaver Ruin Rd in the north, where connections to the Beaver Ruin Trail will be made, and Shelley Lane in the south, where connections will be made to the Killian Hill multi use path (TEE-0010237) in Lilburn. County: Gwinnett As of January 04, 2023, the project is in Final Planning status. Anticipated letting Month is April, 2023. GADOT - Indian Trail - Lilburn Rd From Willow Trail Pkwy to Burns Rd *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Final Planning

Sidewalks / Parking Lot

$2,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
92
Bidding Soon
2,122
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2023

Project location map

Indian Trail Lilburn Rd NW, Lilburn, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.