Site work for a civil project in Belle Chasse, Louisiana. Working plans call for site work for a water / sewer project.

Contract duration: 450 days The work to be performed under this contract includes the construction of 10" sewage force main (approximately 7,200 linear feet), 8" sewage force main (approximately 6,000 linear feet), 4" sewage force main (approximately 4,200 linear feet), 8" gravity sewer (approximately 4,400 linear feet) and manholes, four sewage lift stations, connections to existing residences and all necessary miscellaneous piping, valves, fittings, connections to existing sewer lines, testing and incidental work in accordance with plans and specifications and in such condition as will permit its satisfactory operation. The work is located on the West Bank of the Mississippi River in Belle Chasse, Louisiana. The Contractor shall provide and pay for all labor, transportation, services, power, light, equipment, tools, supplies and all materials and other miscellaneous devices and appurtenances necessary to execute in a complete and workmanlike manner all embraced in the contract documents. The Contractor shall be responsible for any damage resulting from his contract operations and shall restore to same condition as existed prior to his work all streets and sidewalks, bridges, fences, buildings, poles, walls, water lines, gas lines, conduits and other surface or subsurface structures without any direct compensation therefore except as otherwise specified. Attention is directed to the location of sanitary sewer gravity lines, gas mains, water lines, power poles, telephone conduits, etc., which are to remain in their present location. In preparation of his bid, the Contractor shall give consideration to the location of all existing and proposed utilities and improvements including fences, culverts, concrete slabs, etc., which are to remain and which, because of their proximity to the new work, create installation problems due to type of equipment, etc., being used by the Contractor; at certain locations the pipe may be installed in ditches and other areas covered with water or subject to such condition after rain. Also in some locations the pipe may be installed below overhead power and telephone wires, necessitating extra caution and adequate bracing of poles where trench for pipe is against face of poles. Such utilities and improvements shall be adequately supported and protected or may be removed and re-installed at Contractor=s option, without compensation in either case. All existing equipment and materials indicated to be removed but not claimed by the Owner shall become the property of the Contractor and shall be legally disposed of off-site. Q & A deadline: Sep 24, 2020 11:00:00 AM EDT

Final Planning

Water / Sewer

$3,237,000.00

Public - County

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
74
Bidding Soon
841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2020

April 23, 2021

Project location map

Multiple Locations, Belle Chasse, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.