Published October 28, 2020 at 8:00 PM

Updated February 8, 2024

Site work for a water / sewer project in Burlington, Wisconsin. Completed plans call for site work for a water / sewer project.

All bidders must file a "Bidders Proof of Responsibility Form" with the Town of Wheatland on or before 4:00 P.M. on September 11, 2020. A certified check or bid bond payable without condition to the Town of Wheatland in an amount not less than five percent (5%) of the bid shall be submitted with each bid as a guarantee that if the bid is accepted, a proper contract and bond will be executed and filed within ten (10) days after the acceptance of the bid. If such bidder fails to execute and file such contract and bond, the amount of the check or bid bond shall be forfeited as liquidated damages. No bid shall be withdrawn after the opening of bids without the consent of the Town of Wheatland for a period of sixty (60) days after the time of opening bids. Each bidder agrees upon submission of bid that if the same be accepted within said time period, he shall be bound by the terms of acceptance hereinafter contained. The Town of Wheatland reserves the right to reject any or all bids received, or to accept any bid which may be most advantageous to, and in the best interest of Town of Wheatland. Each successful bidder will be required to furnish a satisfactory performance bond in the sum of the full amount of this contract. Approximate quantities of work to be expected are as follows: 1 LS Turbidity Barrier 1 LS Clearing & Grubbing 1 EA Outlet Control Structure 578 LF 16" Dia. Storm Sewer 13 LF 6" Dia. Storm Sewer 2 EA 18" Dia. R.C.P. Apron Endwall 1 EA 6" Dia. R.C.P. Apron Endwall 10 TON Rip Rap MISC 4" Topsoil, Fertilizer, Seed & Erosion Mat Restoration The work will include the furnishing of all labor, materials, equipment, tools, supplies, services, etc., required for the complete installation of the Lilly Lake Outlet Project.

Award

Water / Sewer

$126,856.00

Public - City

Site Work

14

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
242
Bidding Soon
3,407
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2020

November 9, 2020

Project location map

To Be Determined, Burlington, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.