BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2022 at 7:00 PM

Updated November 15, 2023

Site work and renovation of a power facility in Vancouver, British Columbia. Design plans call for the renovation of a power facility; and for site work for a power facility.

Capilano energy recovery facility (CERF) breaker Head Tank (BHT) bypass improvements project that consists of replacement of 900mm PRV valve, inspection and electrical actuation of a butterfly valve, addition of upstream pressure monitoring and updating the CERF BHT control hilosophy. TIMELINE: Preliminary design is underway. Further design, tender and construction timelines may be determined late summer 2021, upon approvals.

Design

Power Plant

$2,000,000.00

Public - City

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
64
Bidding Soon
2,335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

Project location map

Agronomy Rd, Vancouver, BC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.