Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 13, 2021 at 8:00 PM
Updated January 26, 2024
Site work and paving for a mixed-use development in Bakersfield, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
License Requirements Class A Liquidated Damages $2,000.00 per day Project Duration 30 working days Pre-Bid Meeting No Online Q&ANo The work to be performed consists, in general, of constructing a one mile in total length Multi-Use Path along Pacheco Road from Stine Road to Wible Road. The Multi-Use Path will be constructed along the embankment of the canal. The work will consists of, but is not limited to, removal of existing traffic striping and markings, grading and compaction of existing native soil, construction of new Multi-Use Path using Hot Mix Asphalt (HMA), installation of AC dike, channelizers, roadside signs, traffic/path striping and markings; adjustment of sewer cleanouts and pull boxes. During the bidding of this project, contractors who have questions or desire clarifications about the bid documents, must submit those questions or requests for clarifications in writing using the form provided in the bid documents. Said questions and requests for clarifications must be submitted by the date identified in the Request for Information (RFI) form and in these Special Provisions.
Bid Results
Roads / Highways
$268,557.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2021
July 23, 2021
Pacheco Rd, Bakersfield, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
