EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Wray, Colorado. Completed plans call for site work for a water / sewer project.

Award Details Contract Award Date: Apr 07, 2021 Contract Award Number: 140R6021C0003 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 064064124 Contractor Awarded Name: LILLARD & CLARK CONSTRUCTION COMPANY, INC. Contractor Awarded Address: Denver, CO 80236-6118 USA Base and All Options Value (Total Contract Value): $2359960 Bonny Dam is located on the South Fork of the Republican River at Bonny Reservoir, approximately 24 miles north of Burlington, Colorado in Yuma County. It is approximately 4 miles east of US-385 via County Road 2 and County Road KK. Work under these specifications includes the following: 1. Furnish and install a 20-inch manway access onto the 56-inch outlet works pipe. 2. Replace the following materials and equipment in-kind: a. The bolts around and packing within the outlet works pipe expansion joint. b. The 8-inch butterfly isolation valve located in the gate chamber. 3. Replace the hydraulic tubing within the outlet works access tunnel and chamber with stainless steel tubing. 4. Replace the two (2) 3-inch drain valves along the outlet works pipe with 6-inch rising stem gate valves. 5. Remove the existing coating from the concrete gate chamber floor. 6. Clean and fully recoat the following: a. All exposed metalwork within the gate chamber. b. The exterior of the outlet works pipe and all appurtenant features. c. The interior of the outlet works pipe. d. The access house guardrail and ladder. 7. Perform spot repairs on the ventilation ductwork and electrical conduit within the outlet works tunnel. 8. Clean and pressure wash the outlet works gate chamber and tunnel. The estimated price range of this acquisition is between $1,000,000 and $5,000,000.

Award

Water / Sewer

$2,359,960.00

Public - Federal

Site Work

25

2

28

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation, Lead Remediation
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
27
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2020

June 30, 2021

img_map_placeholder

To Be Determined, Wray, CO


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

NK-Bonny Dam Outlet Works Re-Coating

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.