BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Edmonton, Alberta. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

This is pre-qualification of the following scopes of work within the project overview below: Cast in place piling CFA piling (including delegated design) Grade beams and foundations Project Overview The Project is an extension of the existing Metro Line ("Metro Line"). The Metro Line is a 3.3 km high floor, urban style LRT line extending from Churchill LRT Station in downtown Edmonton northwest to the Northern Alberta Institute of Technology ("NAIT") campus. The City has committed to moving forward with the Project, which will provide an LRT to Blatchford, a redevelopment project on the former Edmonton City Centre Airport lands, connecting that community to the City's broader LRT network. The Project seeks to meet heightened expectations for urban, architectural and landscape design and promote design and construction that will support the overall sustainability and resilience of the City. The Project includes: An approximate 1,600-metre at grade double-track extension north of the temporary NAIT station to Blatchford; Construction of two new 5-car LRT stations, NAIT/Blatchford Market and Blatchford Gate; Decommissioning and re-purposing the existing temporary 3-car NAIT LRT station; Utility installation, relocation, and protection; Power supply including power distribution, overhead catenary, and utility complexes; Installation of communications systems, train control and signalling; Integration with the existing Metro Line and the balance of the high-floor LRT network; Testing and commissioning; Environmental mitigation; Construction of a 45-car LRV storage facility at a separate site along the Capital Line Northeast within the Montrose Neighbourhood; Retrofits at the existing DL MacDonald LRV Operations and Maintenance Facility to increase fleet maintenance capacity. Documents can be obtained fromt www.buildworkscanada.com, and www.smartbid.co. The project value listed reflects the total project estimate.

Post-Bid

Transportation Terminals

$200,000,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
245
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2020

October 29, 2020

img_map_placeholder

Multiple Locations, Edmonton, AB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.