Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 26, 2026 at 8:00 PM
Updated July 7, 2026
Site work and new construction of a municipal facility in Calgary, Alberta. Completed plans call for the construction of a one-story above grade municipal facility.
The intent of this Request for Proposals (“RFP”) is to solicit and receive formal offers from prospective Proponents (defined in Section 1.5 below) for the provision of fixed price construction services for the CALGARY – Office of the Chief Medical Examiner – New Build – Construction Services (“Project”), comprising a three-phase delivery including construction of a new OCME facility at 4070 Bowness Road NW while maintaining continuous operation of the existing facility, demolition of the existing building and associated infrastructure following occupancy of the new facility, and site remediation and completion of landscaping works to achieve final project close-out. a) The new facility will replace the existing OCME building (constructed in 1984 with no major renovations to date) and is intended to improve operational workflow, efficiency, and service delivery for the Chief Medical Examiner, staff, and associated stakeholders. The facility will include office and administrative areas, interview and public viewing spaces, morgue and receiving areas, and all associated architectural, structural, mechanical, and electrical systems, including complete building envelope, interior fit-out, coordination of works, and full commissioning to achieve operational readiness. b) The OCME provides critical services under the Fatalities Inquiry Act for southern Alberta, including autopsy examinations, determination of cause and manner of death, and provision of expert evidence in criminal and non-criminal proceedings. The facility operates continuously on a 24/7 basis at varying levels of intensity. Accordingly, the existing facility must remain fully operational throughout construction of the new facility and until full transition of services is completed. The same operational continuity requirement applies during demolition and subsequent site remediation works. c) The Project is structured into three sequential phases: i. Phase 1 – Construction of New Facility: Construction of the new OCME facility on the existing site while maintaining uninterrupted operation of the existing building. The scope includes site preparation, including remediation of existing uncontrolled fill conditions, construction of building and all associated systems, and commissioning to achieve Interim Acceptance. The upper 1.0m of uncontrolled fill beneath and around the building footprint is to be removed and replaced with engineered fill following subgrade compaction and installation of geogrid reinforcement as specified. The OCME must be provided advance notice of vibration-intensive activities to support operational continuity. Interim Acceptance is anticipated as per Article 1.7. Key Dates and Timelines, followed by an approximate four-month operational transition period by the Province. ii. Phase 2 – Demolition of Existing Building: Following relocation of OCME operations to the new facility, the existing building and associated service yard will be fully demolished. This includes removal of underground services, perimeter landscaping, and all associated structures, subject to retention requirements for selected trees as identified in the contract documents. Hazardous materials identified in the provided assessment must be removed and disposed of by qualified contractors in accordance with the Environmental Protection and Enhancement Act and applicable Alberta regulations. iii. Phase 3 – Site Remediation and Landscaping: Final phase includes remediation of the former building site and completion of all landscaping works to integrate the new facility with surrounding site conditions. This includes completion of remaining site grading, planting, and landscape construction in accordance with the landscape drawings, and restoration of all areas affected by demolition activities. Completion of the overall. Owner requires that all interested parties sign a Non-Disclosure Agreement (NDA) in order to access the plans and specs for this project. To obtain the NDA for this project refer to document details in this report.
GC Bidding
Municipal
$35,600,000.00
Public - State/Provincial
LEED Certification, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2026
4070 Bowness Road NW, Calgary, AB
Related To This Project
Calgary, AB
Bid Date: Oct 21 2022
Calgary, AB
--
Calgary, AB
Bid Date: Jul 25 2024
Calgary, AB
--
Calgary, AB
--
Calgary, AB
--
Calgary, AB
Bid Date: Mar 26 2021
Calgary, AB
Bid Date: Jul 26 2022
Calgary, AB
--
Calgary, AB
Bid Date: Oct 17 2022
Calgary, AB
Bid Date: Oct 20 2022
Calgary, AB
Bid Date: Aug 31 2022
Calgary, AB
--
Calgary, AB
--
Calgary, AB
Bid Date: Oct 18 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
