BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2020 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Indianapolis, Indiana. Completed plans call for site work for a water / sewer project.

The Work consists of, but is not necessarily limited to the following: Storm sewer improvements Goals for female participation in each trade: 6.9% Goals for minority participation in each trade: 12.5% A Bid Bond or certified check in an amount not less than five percent (5%) of the amount bid must be submitted with each Bid. A one hundred percent (100%) Performance and Payment Bond will also be required of the successful Bidder. Bidders shall assure that they have obtained complete sets of drawings and Contract Documents and shall assume the risk of any errors or omissions in Bids prepared in reliance on incomplete sets of drawings and Contract Documents. This Work will be funded by the City of Indianapolis. The participation goal for Minority Business Enterprise (MBE) for this contract is fifteen percent (15%). The participation goal for Women Business Enterprise (WBE) for this contract is eight percent (8%). The participation goal for Veteran Business Enterprise (VBE) is three percent (3%) The participation goal for Disability-owned Business Enterprise (DOBE) is one percent (1%). All Bidders will be subject to the MBE/'WBE/VBE/DOBE Business Utilization Plan (' Utilization Plan'/), ofthe City of Indianapolis In evaluating a Bidder' s responsibility, the City 'will consider the Bidder's Affirmative Amon plan. For accommodations needed by persons with disabilities to attend the public bid opening meeting, please call 327-4900. The City of Indianapolis reserves the right to reject any or all bids or to waive any informalities and to accept the bid which it deems most favorable to the interests of the City after all bids have been examined and canvassed. Substantial Completion on or before April 30, 2021, and Final Completion on or before June 15, 2021 There is an existing 8" PVC sanitary sewer, 4" HDPE low pressure sanitary sewer, and 3" HDPE low pressure sanitary sewer within the project limits. The 8" PVC sanitary sewer runs down the middle of Crows Nest Dr. The 4" HDPE Low pressure sanitary sewer runs in the north shoulder of Kessler Blvd. The 3" HDPE Low pressure sanitary sewer runs south down the center of Sunset Ln.

Bid Results

Water / Sewer

$290,000.00

Public - City

Site Work

42

1

2

11

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
61
Bidding Soon
1,170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2020

November 9, 2020

Project location map

Crows Nest Dr, Indianapolis, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.