BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 12, 2020 at 8:00 PM

Updated September 15, 2023

Site work and paving for a bridge / tunnel in Tampa, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Tampa Hillsborough Expressway Authority (THEA) is soliciting sealed bids from qualified firms to provide all the labor, equipment, materials, tools, transportation, supplies, insurance, incidentals, mobilization, demobilization and maintenance of traffic necessary to provide restoration of the Selmon Expressway over Himes Avenue bridge decks and approach slabs, and replacement of the Selmon Expressway over Himes Avenue eastbound departure slab. Firms failing to submit the required documents as outlined within the Instructions and Submittal Documents may be deemed non-responsive to the ITB. THEA strongly encourages the solicitation and utilization of SBE firms and requires nondiscrimination on the basis of race, color, sex and national origin in its contracting practices. Questions concerning this ITB shall be directed by email to Man Le, THEA Procurement Manager at Man.Le@ tampa-xway.com. Remove and replace the departure slab for Bridge #100309 (Selmon Expressway Eastbound over Himes Avenue).The limits of removal shall be the entire approach slab except for the portion of slab supporting the median parapet transition to guardrail. Removal shall be within three (3) inches from this parapet with care takenot to damage the existing reinforcing. The existing reinforcing shall becleaned, straightened and extended a minimum of two (2) feet into the new approach slab.Replacement includes concrete, reinforcing bars, grinding, grooving and striping. Permanent striping patterns shall match existing.

Award

Bridges / Tunnels

$309,843.00

Public - City

Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
335
Active Projects
160
Bidding Soon
2,503
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2020

November 9, 2020

Project location map

Selmon Expressway, Tampa, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.