BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving, asbestos abatement, outdoor lighting and renovation of a mixed-use development in East Moline, Illinois. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; detention facility; and for asbestos abatement for a bridge / tunnel.

As of 05/09/2022 This project has not been awarded. Includes replacement of 40-foot concrete pedestrian bridge, adjacent sidewalk and curb. Includes replacement of metal door and entry. Includes removal of approximately 100 square feet of asbestos containing floor tile. Includes galvanized steel railing and pathway lighting. Due to the COVID-19 Emergency, bids will only be accepted via mail or email. No In-Person submittals of bids will be allowed. Bid modifications will only be accepted via email. No faxed bid modifications will be allowed. All bids will be received at the CDB Springfield Office only. No bids will be received at the CDB Chicago Office or CDB Carbondale Office, and any packages mailed to the CDB Chicago Office or CDB Carbondale Office will not be forwarded to the CDB Springfield Office and will be considered disqualified. MBE/WBE/PBE/VBE firms must be certified or registered with CMS as an MBE, WBE, PBE, or VBE prior to bidding. Bidder may submit a written protest to the Protest Review Office following the requirements of the Administrative Rules, 44 Ill. Adm. Code 8.2075. For protests related to specifications, the Protest Review Office must physically receive the protest no later than fourteen (14) days after solicitation or related addendum was posted to the Bulletin. For protest related to rejection of individual bids or awards, the protest must be received by close of business no later than fourteen (14) days after the protesting party knows or should have known of the facts giving rise to the protest. To reach the Protest Review Office:

Award

Bridges / Tunnels

$187,500.00

Public - State/Provincial

Asbestos Abatement, Outdoor Lighting, Paving, Renovation, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
98
Bidding Soon
1,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2022

April 18, 2022

Project location map

100 Hillcrest Rd, East Moline, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.