BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2020 at 8:00 PM

Updated September 14, 2023

Site work and outdoor lighting for a road / highway in Bakersfield, California. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The work to be performed consists, in general, of three phases. Phase One, the Contractor shall furnish and install: conduit, pull boxes and foundations for a pedestal and new street light poles. Phase Two, the City shall furnish and install: service pedestal and controls, conductors, splicing, light poles and luminaires. Phase Three shall not begin until the new lighting system is operational. Phase Three, the Contractor shall: remove, deliver and unload old light poles to the City Storage Facility located at 2000 South Union Avenue, remove and dispose of old pull boxes, fill pull boxes located in sidewalk with concrete, remove pole foundations and series circuit conductors and conduit to 12'' below grade. Contractor shall refer to part B of these specifications for the proper handling and disposal of hazardous materials (asbestos/lead). This bid is for Phase 1 and Phase 3, which is the Contractor's responsibility. During the bidding of this project, contractors who have questions or desire clarifications about the bid documents, must submit those questions or requests for clarifications in writing using the form provided in the bid documents. Said questions and requests for clarifications must be submitted by the date identified in the Request for Information (RFI) form and in these Special Provisions. Type of award Lump sum License Class AClass C-10 Liquidated damages 1000$ per day Duration 30 working days MBE/WBE-15 %

Bid Results

Roads / Highways

$329,500.00

Public - City

Outdoor Lighting, Site Work

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2020

November 19, 2020

Project location map

Oleander Ave, Bakersfield, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.