BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in Woodland, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Project no: 201116.00, MC03-02-2, 2042 Project Summary: Construction of a new classroom building located on the north end of existing elementary school campus. The building will consist of 5 classrooms, two student restrooms, one staff restroom and several ancillary spaces. Site features including covered lunch area, bike corral, paving, hardscape, landscape, irrigation and fencing. The project is a ten month project scheduled to begin on 10/29/2021. This is a collaborative lease-leaseback contract which is governed by a guaranteed maximum price. Our approach to lease-leaseback requires all of the project team members - owner, design team, inspector, general contractor, and subcontractors - to together look out for the best interests of the project, solving problems and moving the project forward. Subcontractors shall be responsible for proactively identifying and resolving all minor conflicts and problems with the plans and specifications, both prior to bid and during the course of the project. All subcontract bidders must be prequalified with Landmark. At the time of bid, October 19, 2021, MEP subcontractors must be prequalified with the district. As always, we welcome any input the subcontract community may have with regard to value engineering alternatives, potential cost savings, and constructability. These items may be submitted at any time during the bid process.All subcontract bidders must be prequalified with Landmark. California Assembly Bill (AB) 1565 went into effect on January 1, 2014. AB 1565 requires ALL General Contractors and M/E/P Subcontractors be prequalified, if the project is valued at $1 million or more and funded whole or in part with State Facility Bond funds. Public Contract Code 20111.6 requires the district to do so for certain projects. This applies MEP sub-contractors with the following licenses C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46.The District must receive complete applications at least ten (10) business days prior to the scheduled bid opening on any advertised project in order for the candidate to qualify for a project in excess of $1,000,000 and partially funded by the State. Pre-qualification approval will remain valid for one (1) calendar year from the date of notice of qualification except as noted in the pre-qualification documents.

Award

Educational

$4,142,520.00

Public - City

New Construction, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
80
Bidding Soon
1,445
All Active Projects
614
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.