BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2020 at 7:00 PM

Updated June 21, 2025

Site work and new construction of an educational facility in N Miami Beach, Florida. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Biscayne Gardens Elementary School New Construction 560 N.w. 151 Street Miami, Florida 33169 Project No. 01775600 Addendum #1-#3 have been issued. Bidders desiring to participate in this solicitation must be pre-qualified by the Board prior to submitting their bid in response to this solicitation. Contact the Miami-Dade County Public Schools (M-DCPS) Office of Economic Opportunity at (305) 995-1307 or via email at oeo@dadeschools.net for information regarding Contractors' Pre-qualification procedures. Written questions regarding this project will be accepted. All written communications must be sent to the Project Architect/Engineer, Alex Silva (Asilva@silvaarc.com), Silva Architects, LLC.; 135 San Lorenzo Avenue, Suite 880, Coral Gables, Florida 33146. Questions will be accepted until 5:00 pm on Wednesday, October 14, 2020. Answers will only be issued to the Prime Contractors who attended the mandatory Pre-bid Conference. Additional Pre-Bid info - Prime Contractors who are interested in submitting a bid for both projects are required to attend both Pre-Bid Conferences to be eligible. Firms have the option to bid on one project individually or on both projects. Each session will be restricted to one representative from Prime Contracting firms only, limiting each group to a maximum of seven potential bidders for each of the proposed conferences. All attendees must always wear face masks and maintain a minimum of 6 feet distance from all other persons. Gloves are optional but recommended. There will be a sign-in period for each session of 15 minutes from the start time scheduled. Potential bidders arriving after the 15-minute sign-in period (of the final scheduled session) will not be allowed to participate in this solicitation. Prime Contractors without a reservation who arrive prior to the end of the 15-minute sign-in period of the final session will be accommodated at the discretion of the Project Team. Proposals submitted by firms not represented at the Mandatory Pre-Bid Conferences will not be considered. Submitting Request to Attend Pre-bid Conference : All Prime Contractors wishing to attend are strongly encouraged to submit an e-mail to Silva Architects (Asilva@silvaarc.com) confirming their attendance by Monday, October 5, 2020 at 5:00 p.m. A Pre-Bid Conference reservation email containing a scheduled time will be sent by the Project Architect/Engineer, to each potential attendee, no later than Tuesday, October 6, 2020 at 5:00 p.m. Reservations received after 5:00 pm on October 5, 2020 will be accommodated at the Project Team's discretion.

Under Construction

Educational

$15,105,440.00

Public - County

New Construction, Site Work

108

24

58

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
81
Bidding Soon
1,778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2020

November 18, 2020

Project location map

560 NW 151st St, N Miami Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.