Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 23, 2025 at 8:00 PM
Updated May 24, 2025
Site work for a fire / police facility in N Miami Beach, Florida. Completed plans call for site work for a fire / police facility.
A. Layout of Work: The work in general consists of the Contractor providing and installing a 61' x 17' insulated roof structure utilizing 3" insulated panels on an existing asphalt surface. The Structure will serve as a weather resistant canopy between the temporary FORTS units, Kitchen container, and Restroom trailer. B. Scope of Work: 1. Structure / Materials (refer to sheet A-1.0) i. All structure materials shall meet the current Florida Building Code standards. ii. Insulated panels and structure components shall be white in color. iii. Insulated panels shall be 3" thick, 1lb density and a .030" gauge aluminum skin. iv. Aluminum support Box Columns shall be 4"x 4" x 1/8" v. Aluminum Box Beam shall be 2" x 9" x 1/4" vi. Mounting base angle brackets shall be 4" x 4" x 1/4" vii. All mounting and structure hardware shall meet manufacture and building code specifications. 2. Construction i. Contractor shall dig 16"dia x 24" deep support footers in the locations noted on sheet A-0.1. ii. Contractor and MDFR Project Manager will mark out the footer locations to ensure there are no interferences or obstacles. iii. Contractor shall fill footer holes with 3000 psi concrete to meet the surrounding elevation. iv. Contractor shall ensure the concrete has properly cured for a minimum of 7 days before the support brackets are mounted. v. Contractor shall ensure the water shed from the structure moves to the North with a slope of 1/4 ": 1'-0" vi. Contractor shall ensure the height and placement of the structure does not interfere with the temporary FORTS units, Kitchen container, and Restroom trailer. vii. Contractor shall ensure all roof hardware is weather resistant and properly sealed to prevent leakage. All work must be completed 30 days from notice to proceed. LIQUIDATED DAMAGES in the amount of $100 per calendar day will be assessed for each day the project is delayed. RFI's The last day for project RFI QUESTIONS is Friday , April 25, 2025 at 5:00 PM. Any questions submitted after aforementioned date shall not be considered. MDFR will review and answer the questions, prior to the bid due date.
Post-Bid
Fire / Police
$23,500.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
May 19, 2025
1655 NE 205th St, N Miami Beach, FL
Related To This Project
N Miami Beach, FL
Bid Date: Jul 16 2025
N Miami Beach, FL
Bid Date: Oct 29 2020
N Miami Beach, FL
Bid Date: Aug 25 2025
N Miami Beach, FL
Bid Date: Jun 19 2025
N Miami Beach, FL
Bid Date: Jan 31 2025
N Miami Beach, FL
Bid Date: Sep 17 2024
N Miami Beach, FL
Bid Date: Sep 12 2024
N Miami Beach, FL
--
N Miami Beach, FL
Bid Date: Aug 01 2024
N Miami Beach, FL
Bid Date: Jul 03 2024
N Miami Beach, FL
Bid Date: Mar 13 2024
N Miami Beach, FL
--
N Miami Beach, FL
Bid Date: Nov 07 2023
N Miami Beach, FL
--
N Miami Beach, FL
Bid Date: Oct 26 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
