Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 27, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a municipal facility in Boulder City, Nevada. Completed plans call for the renovation of a municipal facility.
Contract No. 009687 PROJECT IDENTIFYING NUMBER CL-2022-133 Question Cutoff Date 2/26/2022 01:00:00 PM (ET) The Sites of the Work are Pumping Plant # 1A, which is located at the Alfred Merritt Smith Water Treatment Facility, 243 Lakeshore Road, Boulder City, NV 89005 and Pumping Plant # 2A, which is located one and-a-half (1.5) miles west of the Alfred Merritt Smith Water Treatment Facility. The Work consists of replacing two (2), existing, trolley-mounted electric hoists with new, trolley-mounted electric hoists rated at 12.5 tons at Pumping Plant #'s 1A and 2A. The existing hoists manufactured by the ACCO Wright Co. are mounted on existing, overhead bridge cranes provided by the Frontier Industrial Machinery Corp. The lifting capacity of the existing bridge cranes and hoists is 10.0 tons. The project additionally includes structurally modifying the existing bridges and bridge trolleys to increase the lifting capacity of the bridges to the 12.5 ton rating. The scope of work includes providing the steel materials for the structural modifications and performing the structural modifications to both bridge cranes and bridge trolleys. The structural analysis and the design of the structural modifications for the bridges and bridge trolleys has been completed by ES2, Engineering System Solutions Company. There is one bridge crane at each pumping plant, and the cranes at each plant are identical in all respects. This contract includes detailed specifications for bridge cranes and hoists in Section 41 22 13. Please refer to this section for additional details on the scope of work and equipment specifications.
Post-Bid
Municipal
$550,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed