BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Boulder City, Nevada. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Work includes the abandonment of a majority of the existing sanitary sewer system within ABC Park and the construction of a new sanitary sewer system including the seven 4" PVC service laterals, seven manholes, approximately 833 linear feet of 8" PVC main line, and associated appurtenances. In addition to the work on the sanitary sewer system, the potable water system will require the removal and replacement of one fire hydrant and the abandonment of a service lateral. This work shall also include the removal of existing surface improvements such as asphalt paving & curbing, concrete sidewalks & curbing, and other miscellaneous improvements. The work shall include the construction of a new loop road and parking areas consisting of approximately 3,350 square yards of 2" asphalt, 1,600 linear feet of concrete curbing, accessible ramps, concrete valley gutters, associated pavement markings & striping, and traffic signage. Areas where construction operations have disturbed existing landscaping will require the repair of existing irrigation systems and the application of a 2" layer of decomposed granite (DG) or the application of a dust palliative. NRS 332.065 CERTIFICATION: Prospective bidders are notified that they shall make certification of conformance as required per Subsection 2 of NRS 332.065. PROPOSAL GUARANTEE: Each proposal shall be accompanied by a certified or cashier's check or bid bond in an amount not less than five percent (5%) of the total bid price, payable to the City of Boulder City as a guarantee that the bidder, if his proposal is accepted, will enter into a contract within fifteen (15) calendar days after receipt of the contract from the Owner Workman's Compensation Insurance, Faithful Performance Bond in the amount of one hundred percent (100%) of the total bid price, a Labor and Material Bond in the amount of one hundred percent (100%) of the total bid price, and a Guarantee Bond will be executed as part of the contract agreement.

Award

Water / Sewer

$1,318,878.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
26
Bidding Soon
426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

September 1, 2022

Project location map

801 Adams Blvd, Boulder City, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.