BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2020 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Salt Lake City, Utah. Completed plans call for site work for a water / sewer project.

**As of October 21, 2020. Project has been awarded. Bid amount received $484,626.03 Cured in place lining rehab of 30" sewer main Approximately 568 lf. The work, in general, consists of the following: a) The Cured-in Place (CIPP) rehabilitation lining of approximately 15 pipe segments varying from 47.53 feet long to 520.90 feet long. The existing pipe is 30-inch reinforced concrete pipe in deteriorated condition. The work shall include but not be limited to all traffic control, bypass pumping, pipe cleaning and pre-lining video, lining, curing, post lining video, and site restoration necessary to complete the project in accordance with the plans and specifications. b) All work and material necessary to complete the work in accordance with the Contract Documents and in conformance with the Design Standards and Construction Specifications for Eagle Mountain City. A bid bond in the amount of 10% of the bid amount will be required. All question & answers for the project will go through electronically. The project is located approximately at Saratoga Road near 900 E and 7200 N, Saratoga Springs, UT 84043. Question Submission Close Date 10/12/2020 12:00 PM MDT

Award

Water / Sewer

$484,627.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
54
Bidding Soon
1,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2020

November 12, 2020

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.