Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 15, 2020 at 8:00 PM
Updated April 9, 2025
Renovation of an educational facility in Dayton, Ohio. Completed plans call for the renovation of a educational facility.
Dayton Public School District (DPSD) intends to enter into an agreement with a qualified vendor to provide Building Automation Systems Upgrade services. Sr. Contract Specialist, Bobby J. Smith, is the point of contact and may be reached via email at bjsmith@daytonpublic.com The Board of Education reserves the right to accept or reject any or all proposals resulting from above solicitation. Rosa Parks - 3705 Lori Sue Ave., Dayton OH 45406 Louise Troy - 1630 Miami Chapel Rd., Dayton OH 45417 Overall Scopes of Work descriptions, published Supplemental Drawings/Documents and general provisions of the Performance Specification Contract, including General and Supplementary Conditions and Documents of Owner Requirements apply to this Section. Refer to Original and subsequent RFQ/RFP Documents issued by District's Professional Services Consultants, that may be referred to as the Owner's Project Requirements (OPR). The OPR Documents in-whole are considered the minimum standard on which the Proposing Design-Build format Contractor bases his offering. Each Proposing Contractor (and necessary sub-contractors/vendors) will familiarize himself/team with all documents issued as part of the OPR, including Front-End, Exhibits and For-Reference documents in addition to typical drawings & specifications addressing the project Scopes of Work. Each Proposing Contractor will issue an RFI (Request for Information) for any apparent or possible conflict found in the OPR documents/field verification efforts in a timeframe before Proposals are due such that the District can responsibly offer a clarification on each item in question. If in the event that any conflict discovered/questioned in the OPR documents (i.e. between Specifications and Drawing references) is not properly/officially addressed prior to Proposals being due, the Proposing Contractor will base his offer on the most conservative/stringent/highest value or quantity of the interpretation of the matter, as determined by the Owner/Consultant, which will then continue into final design & coordination stages after a successful award of Contract is made.
Post-Bid
Educational
$200,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2020
October 30, 2020
Multiple Locations, Dayton, OH
Related To This Project
Dayton, OH
Bid Date: Apr 24 2025
Dayton, OH
Bid Date: May 15 2025
Dayton, OH
--
Dayton, OH
--
Dayton, OH
--
Dayton, OH
--
Dayton, OH
--
Dayton, OH
Bid Date: May 01 2025
Dayton, OH
--
Dayton, OH
Bid Date: Apr 24 2025
Dayton, OH
--
Dayton, OH
Bid Date: Apr 11 2025
Dayton, OH
Bid Date: Apr 15 2025
Dayton, OH
Bid Date: Apr 09 2025
Dayton, OH
Bid Date: Mar 28 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
