BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2020 at 8:00 PM

Updated April 9, 2025

Renovation of an educational facility in Dayton, Ohio. Completed plans call for the renovation of a educational facility.

Dayton Public School District (DPSD) intends to enter into an agreement with a qualified vendor to provide Building Automation Systems Upgrade services. Sr. Contract Specialist, Bobby J. Smith, is the point of contact and may be reached via email at bjsmith@daytonpublic.com The Board of Education reserves the right to accept or reject any or all proposals resulting from above solicitation. Rosa Parks - 3705 Lori Sue Ave., Dayton OH 45406 Louise Troy - 1630 Miami Chapel Rd., Dayton OH 45417 Overall Scopes of Work descriptions, published Supplemental Drawings/Documents and general provisions of the Performance Specification Contract, including General and Supplementary Conditions and Documents of Owner Requirements apply to this Section. Refer to Original and subsequent RFQ/RFP Documents issued by District's Professional Services Consultants, that may be referred to as the Owner's Project Requirements (OPR). The OPR Documents in-whole are considered the minimum standard on which the Proposing Design-Build format Contractor bases his offering. Each Proposing Contractor (and necessary sub-contractors/vendors) will familiarize himself/team with all documents issued as part of the OPR, including Front-End, Exhibits and For-Reference documents in addition to typical drawings & specifications addressing the project Scopes of Work. Each Proposing Contractor will issue an RFI (Request for Information) for any apparent or possible conflict found in the OPR documents/field verification efforts in a timeframe before Proposals are due such that the District can responsibly offer a clarification on each item in question. If in the event that any conflict discovered/questioned in the OPR documents (i.e. between Specifications and Drawing references) is not properly/officially addressed prior to Proposals being due, the Proposing Contractor will base his offer on the most conservative/stringent/highest value or quantity of the interpretation of the matter, as determined by the Owner/Consultant, which will then continue into final design & coordination stages after a successful award of Contract is made.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

147

12

14

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
174
Bidding Soon
2,075
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2020

October 30, 2020

Project location map

Multiple Locations, Dayton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.