BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2020 at 7:00 PM

Updated December 11, 2025

Site work and paving for a sidewalk / parking lot in Saint Louis, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Owner will occupy the site and the existing building during the entire period of construction. Contractor shall cooperate fully with the Owner or his/her representative during construction operations to minimize conflicts and to facilitate Owner usage. Contractor will not be held responsible for or penalized for work stoppages or delays initiated by the Owner. However, the Contractor will be responsible for any delays caused by his/her failure to cooperate with directives or requests by the Owner which prolong or cause delays or stoppages. MBE : 24.0% WBE : 9.5%%

Award

Sidewalks / Parking Lot

$299,691.00

Public - County

Paving, Site Work

7

8

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
139
Bidding Soon
1,220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2020

December 7, 2020

Project location map

4000 Jennings Station Rd, Saint Louis, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.