BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2020 at 7:00 PM

Updated November 14, 2023

Site work and paving for a bridge / tunnel in Eagle Pass, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

for Ps&e Project Questions Call: Sergio Reyna 1817 Bob Bullock Lp Laredo, Tx 780430000 956/712-7468 Length: 25 Mi Time for Completion: 15 Calendar Days Limits From: 0.01 Mi E. Of Fm 1021 at the Uprr Bridge Limits to: 0.215 Mi. E TXDOT - US0057 - Rehabilitation of a Bridge Facility Prior to beginning work, attend a TxDOT arranged Pre-Construction meeting. The PreConstruction meeting will consider the sequence of work, work locations, traffic control, plans, specifications, unusual conditions, and other pertinent items regarding the work. Written notification will be given advising of when operations may begin. The Contractor will be advised of the applicable number of days allowed to complete the work and the date when the time charges commence. Designate an on-site representative who has full authority to make decisions with respect to the project. Coordinate all project issues with the Texas Department of Transportation (TxDOT) through the designated on-site representative. The quantities in the proposal are approximate. The quantities of work and materials may be increased or decreased as considered necessary to complete the work as planned and contemplated. This project is to be completed in 15 calendar days and will be accepted when fully completed and finished to the satisfaction of the Executive Director or designee.

Award

Bridges / Tunnels

$161,400.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
51
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2020

January 15, 2021

Project location map

US-57, Eagle Pass, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.