BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of an educational facility in Mont Belvieu, Texas. Completed plans call for the construction of a 220,195-square-foot, two-story above grade educational facility.

**As of January 13, 2021, Project (Package 02) has been awarded to subcontractors, and construction was started back in December 2020. This is scheduled to be completed sometime July of 2022. Package 02 Each subcontractor will provide the cost of a payment and performance bond as a separate line item on the proposal form. Barbers Hill Intermediate School South to be located on the west side of the Lost Lake Drive and FM 565 Intersection in Baytown, Texas. Project Location: 5959 Gill Parkway, Mont Belvieu, Texas 77523 The Work of this project includes construction of a new elementary school to replace an existing school on the project site. Work will include, but is not limited to the following: a. Foundation: Concrete slab-on-grade, grade beams and drilled concrete piers. b. Exterior Wall assembly: Light gage steel stud framing, masonry, brick veneer and formed metal wall panels. c. Structural steel framing with fireproofing for Type IB construction. d. Modified bitumen membrane roofing over light weight insulated concrete roof deck. e. Aluminum framed storefront and curtainwall fenestration. f. Hydraulic elevators. g. Food service equipment. h. Scheduled interior finishes. i. Mechanical, plumbing and electrical systems. j. Site work for utilities, earthwork, drainage and paving for parking and drives. k. Landscaping and irrigation. l. Technology, communications, AV and security systems. m. Related items as required for a complete construction project as indicated in the construction documents. 1. Commence work: Notice to Proceed date October 30, 2020. 2. Substantial Completion: May 13, 2022

Award

Educational

$51,500,000.00

Public - County

New Construction, Site Work

479

28

192

2

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
68
Bidding Soon
2,668
All Active Projects
940
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2020

December 7, 2020

img_map_placeholder

5959 Gill Pkwy, Mont Belvieu, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.