Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Old Bridge, New Jersey. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of October 19, 2021, a design engineer has been awarded. *The previous solicitation is listed below for reference Bridge Repairs and Resurfacing, Milepost 92 to 122 and the Newark Bay-Hudson County Extension, consists of work on the New Jersey Turnpike (TPK), which involves implementation of lane shifts or traffic detours; selective replacement of complete deck panels bounded by stringers and diaphragms; partial depth concrete spall repairs; joint header, abutment headblock and joint riser bar replacement or repairs; armor joint modifications; joint seal installation or replacement; safety walk and curb surface repairs with provisions for temporary electrical lighting service; replacement of bridge railing; isolated parapet replacement including new electrical conduits and service; removal and replacement of existing asphalt wearing surface with a new membrane/asphalt system or with a high density, impermeable, cementitious overlay; high performance concrete in deck and parapaet, structural steel repairs; substructure repairs; laminated elastomeric bearings; emergency and routine repairs under cost plus compensation; and other incidental work. Work will require installation of concrete construction barrier and other incidental work on the TPK between Milepost 92 and 122 and the Newark Bay-Hudson County Extension in Middlesex, Union, Essex, Hudson, and Bergen Counties. In order to accomplish the above items, lanes are being closed with traffic cones and repair work consisting of the above outlined items is being carried out within the coned off closings. Deck replacements are being performed within Type 4 concrete construction barrier enclosures. The majority of the deck replacements, because of their location encroaching on the adjacent lane or straddling two lanes, and due to the use of the concrete construction barrier, frequently require utilization of the shoulders, as a traffic lane and shifting of traffic by means of obliteration of the existing line striping and use of temporary line striping. Placement and removal of the temporary line striping and of the concrete construction barrier, in general, necessitates the closing of supplementary or "buffer" lanes which are only permissible during certain off peak traffic times, late at night. The above work operations on the Turnpikes mainline are carried out in condensed, weekend or part weekly construction stages with single or multi-lane closings. Due to the around the clock work, minimum two shift staffing is required for the field supervision. Maximum staffing is needed over weekends when the Contractor handles the largest work volumes. The anticipated contract duration is 10 months and the estimated construction cost is $12 million.
Design
Bridges / Tunnels
$12,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 3, 2022
Multiple Locations, Old Bridge, NJ
Related To This Project
Old Bridge, NJ
Bid Date: Jan 13 2022
Old Bridge, NJ
--
Old Bridge, NJ
Bid Date: Feb 08 2022
Old Bridge, NJ
--
Old Bridge, NJ
Bid Date: Aug 10 2022
Old Bridge, NJ
Bid Date: Nov 09 2023
Old Bridge, NJ
Bid Date: Nov 03 2023
Old Bridge, NJ
Bid Date: Nov 03 2023
Old Bridge, NJ
Bid Date: Dec 07 2021
Old Bridge, NJ
Bid Date: Jan 06 2022
Old Bridge, NJ
Bid Date: Jan 07 2022
Old Bridge, NJ
Bid Date: Sep 25 2023
Old Bridge, NJ
Bid Date: Sep 26 2023
Old Bridge, NJ
Bid Date: Sep 26 2023
Old Bridge, NJ
Bid Date: Sep 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.