BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Cape Canaveral, Florida. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of July 19, 2023, information regarding award and award date has not been disclosed. This project is currently in the feasibility study phase. Although a firm timeline has not been established, design is estimated to take place in 2023-2024. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Oral Presentation PD&E Study, SR 401 Bridge Replacement TRC Members (Subject to Change) : Ed Kestory Todd Long William Walsh The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. Financial Management Number(s) 444787-1-22-01 Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Oral Presentation Date: 11/12/2020 8:30AM Longlist Date/Time 10/28/2020 06:30 pm Shortlist Selection Date/Time 11/02/2020 08:00 pm Technical Review Committee Meeting 1 Date/Time 11/12/2020 08:00 pm Technical Review Committee Meeting 2 Date/Time 11/12/2020 10:30 pm Technical Review Committee Meeting 3 Date/Time 11/13/2020 01:30 am Final Selection Date/Time 12/07/2020 08:00 pm Negotiations Period Begin Date 12/09/2020 Negotiations Period Ending Date 2/09/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - PD&E Study, SR 401 Bridge Replacement

Conceptual

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
46
Bidding Soon
880
All Active Projects
380
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

img_map_placeholder

FL-401, Cape Canaveral, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.