Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of an educational facility in Lake Charles, Louisiana. Completed plans call for the renovation of a educational facility.
As of October 6, 2020, a designer has been awarded. *The previous solicitation is listed below for reference. --- This project consists of repairs to utilities infrastructure, roofing, rooftop equipment, exterior envelope including windows, mechanical and electrical systems, and associated interior water-damaged finishes caused by Hurricane Laura. The scope of work includes approximately six (6) structures totaling approximately 360,000 s.f. Design services shall include a comprehensive damages assessment to assist with the loss claims and restoration effort. The program completion/comprehensive damage assessment will be considered the equivalent of completion of basic design services through Schematic Design (15%). The Design team should complete the initial assessment within 8 days in order to verify funds needed for repairs. If any of the buildings are determined to be substantially damaged and require replacement, then those building(s) will not be part of this scope. After assessment, FPC intends to amend the Designer's contract to add additional phases of basic services. FPC anticipates that the Designer will develop Bid Proposal Documents from the initial assessment. Proposal Documents should be ready by October 16, 2020. Designer will then solicit proposals from contractors for the repairs. FPC would like for contractors to be on site by the week of October 26, 2020. A pre-design conference will be scheduled via Zoom call on Friday, September 18, 2020. If selected, Designer is required to submit signed contract and all accompanying documentation within 48 hours of receipt of contract. Designer is to immediately begin facility assessments. Designer may be furnished with a preliminary damages assessment, if available, from which Designer will confirm site conditions to establish the final scope of repairs. Mitigation of water-damaged finishes has already begun; however, additional demolition and/or remediation may be required. Electrical and Mechanical equipment shall be tested in order to determine repairs or replacement. Hazardous materials abatement is anticipated and all related sampling, testing and environmental remediation are part of these design services. Third-party sampling, testing and air monitoring will be reimbursable expenses. Designer should anticipate ORM & FEMA participation in all phases of assessment, design and construction and assist with ORM & PW scope and cost alignment as required. All work and invoicing shall be separated by claim / PW number in accordance with ORM / FEMA requirements. Designer shall be mindful of the strict deadlines referenced herein. The Designer shall prepare and submit all required drawings to Facility Planning and Control in AutoCAD and hard copy. Drawings shall follow the format specified in the "Instructions to Designers for AutoCAD Drawings Submittal". The funds available for construction are approximately $2,000,000.00 with a fee of approximately $24,854.00.
Award
Educational
$20,980,617.00
Public - State/Provincial
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2020
October 30, 2020
4205 Ryan St, Lake Charles, LA
Related To This Project
Lake Charles, LA
Bid Date: Feb 08 2022
Lake Charles, LA
Bid Date: Jan 20 2022
Lake Charles, LA
Bid Date: Mar 03 2022
Lake Charles, LA
Bid Date: Mar 03 2022
Lake Charles, LA
--
Lake Charles, LA
Bid Date: Mar 15 2022
Lake Charles, LA
Bid Date: Feb 15 2022
Lake Charles, LA
Bid Date: Feb 08 2022
Lake Charles, LA
Bid Date: Feb 09 2022
Lake Charles, LA
Bid Date: Feb 10 2022
Lake Charles, LA
Bid Date: Feb 01 2022
Lake Charles, LA
Bid Date: Jan 27 2022
Lake Charles, LA
Bid Date: Jan 27 2022
Lake Charles, LA
Bid Date: Jan 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.