Published November 5, 2020 at 7:00 PM

Updated September 14, 2023

Site work, paving and new construction of a bridge / tunnel in Odessa, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction of Bridge Number 18700171 The proposed work includes: The construction of a new 64'-0" single span, pre-cast voided beam-slab bridge with steel piling, concrete abutments, w-beam railing, traffic control, and all appurtenances. Special Needs: If you have special needs addressed by the Americans with Disabilities Act, please notify the County Clerk at 660-259-4315 at least 5 working days prior to the bid opening you plan to attend. The wage rates applicable to this project have been predetermined as required by law and are set forth in the bid proposal. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962" (P.L. 87-581; Stat. 357) and implementing regulations. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109, and E.O. 11246 The County of Lafayette hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2019 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Contractors and subcontractors who sign a contract to work on public works projects must provide a 10-hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The right is reserved to reject any or all bids. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE goal for this project is 8%. No 2" tier subcontracting will be allowed on this project.

Award

Bridges / Tunnels

$272,185.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
31
Bidding Soon
624
All Active Projects
234
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2020

November 26, 2020

img_map_placeholder

To Be Determined, Odessa, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.