BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2021 at 7:00 PM

Updated July 19, 2024

Site work, new construction and addition to an educational facility in Columbia, South Carolina. Completed plans call for the expansion of a primary / secondary education facility.

The new E.L. Wright Middle School is being built in multiple phases on the same site as the existing structure. It is comprised of three 3-story academic wings with a main spine connecting the academic wings to the athletics wing, library, dining, administrative spaces and Center for Knowledge. Outdoor courtyards and organic playscapes are created by the spaces in between the academic wings. As of January 2021, bids were taken in November 2020 and site work is currently underway. It is anticipated to be completed in December of 2023.

Under Construction

Educational

$50,000,000.00

Public - City

Addition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
105
Bidding Soon
1,147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2020

Project location map

2740 Alpine Rd, Columbia, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.