BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2021 at 8:00 PM

Updated July 19, 2024

Site work and paving for a sidewalk / parking lot in Columbia, South Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Richland School District Two is seeking sealed bids from qualified contractors to restripe twenty-five (25) District parking lots. Bidders are encouraged to familiarize themselves with the job sites and all aspects of the scope of work requirements prior to submitting a bid. Contractors are strongly encouraged to attend ALL pre-bid site visit meetings. A copy of the bid package is available on the District's e-Procurement Portal, ProcureNow. No late bids will be accepted. Direct Inquiries To: procurement@richland2.org The purpose of this solicitation is to competitively obtain bids to acquire supplies, services, or equipment which complies with the enclosed description and/or specifications and conditions for Richland School District Two for the following project: PARKING LOT RESTRIPING, IFB 21-020. Richland School District Two is seeking sealed bids from qualified contractors to restripe twenty-five (25) of the District school's parking lots. Bidders are encouraged to familiarize themselves with the job sites and all aspects of the scope of work requirements prior to submitting a bid. Contractors are strongly encouraged to attend the pre-bid meetings. This is the ONLY opportunity to see the scope of work to be performed. Contract Period begins: June 21, 2021 through August 31, 2021. There will be a $500 per day penalty if the job is not completed by the end of this contract period. Richland School District Two will accept bids from qualified contractors to furnish paint and labor to restripe parking lots at twenty-five (25) schools, per the following specifications: o Contractor to restripe all parking lots, fire lanes, etc., to include repainting any curbing that has already been previously painted. o Contractor will remove all empty containers and waste produced from the project and dispose of off-site. Contractor is responsible for the removal of any debris on a daily basis. o Work will need to take place on weekends and after 4:00 pm on weekdays while school is in session. Maintenance Director will discuss the starting date for work with the winning bidders, but work should take no more than two months to complete, once started.

Award

Sidewalks / Parking Lot

$300,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
8
Bidding Soon
879
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2021

June 21, 2021

Project location map

Multiple Locations, Columbia, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.