BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Cambridge, Minnesota. Completed plans call for the renovation of a municipal facility.

As of 11/11/2020 The EDA and City Council will approve the bid award to the contractor on Monday November 16. Approx 600 squares of fully adhered EPDM roofing, including skylight replacement and mechanical/electrical rehabilitation Roof Replacement and Mechanical Rehabilitation at Cambridge City Hall, 300 Third Avenue NE, Cambridge, Minnesota City Center Mall, 140 Buchanan Street North, Cambridge, Minnesota A. Work Areas: 1. Reroofing on City Hall Areas A1-A6 2. Reroofing on City Center Mall Area B1 3. Mechanical/electrical rehabilitation at both buildings 4. Modifications to existing coax cables that run along the east roof edge at both buildings, and also at City Market (no-reroofing area) B. Existing Roof Construction: 1. Area A1: 1/8"/ft. structurally sloped, 1-1/2" narrow ribbed steel deck, 6-mil poly vapor retarder, two layers of 2" isocyanurate insulation with 1//2"/ft. tapered cricket at the north parapet, and a rock ballasted EPDM membrane. 2. Area A2: 1/8"/ft. structurally sloped, 1-1/2" narrow ribbed steel deck, 6-mil poly vapor retarder, two layers of 2" isocyanurate insulation, 1/2" cover board, and a rock ballasted EPDM membrane. 3. Area A3: Flat 3" steel deck, 1/4"/ft. tapered isocyanurate insulation (0 to 2" thick), 1.5" isocyanurate insulation, and a loose laid EPDM membrane without ballast. 4. Area A4: Flat 3" steel deck, tapered isocyanurate, 2" isocyanurate insulation, and a loose laid EPDM membrane without ballast. 5. Area A5: Flat 1-1/2" narrow ribbed steel deck, 6 mil poly vapor retarder, tapered isocyanurate insulation (1-1/2" to 3" thick), 2" isocyanurate insulation, and a loose laid EPDM membrane without ballast. 6. Area A6: Flat 3" steel deck, tapered isocyanurate insulation (3/4" to 2-1/2" thick), and a loose laid EPDM membrane without ballast. 7. Area B1: 1/8"/ft. structurally sloped 1-1/2" narrow ribbed steel deck, two layers of 2" isocyanurate insulation with a 1/2"/ft. tapered isocyanurate insulation cricket at the east roof edge mechanically fastened to the deck, followed by a fully adhered EPDM membrane. Remove obsolete penetrations indicated on the Drawings and cover opening in deck. Replace existing roof-related wood blocking slated for reuse if it contains more than 19 percent moisture, shows evidence of rotting, or is otherwise in a condition that provides an unsuitable substrate to receive new materials. On all areas, remove existing ballast, membrane, flashings, and wet, damaged, or deteriorated insulation. Install new scuppers, overflow suppers, downspouts, splashpans, pipe box enclosures, pipe supports, walkway pads, and safety rail.

Award

Municipal

$1,032,070.00

Public - City

Renovation

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
77
Bidding Soon
724
All Active Projects
283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2020

May 17, 2021

img_map_placeholder

Multiple Locations, Cambridge, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.