BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Springfield, Missouri. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of January 26, 2022, an engineer has been selected for the project. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 4th quarter of 2022. *The closed solicitation has been included below for reference: The City of Springfield has posted a Request for Qualifications (RFQ) for Construction Manager at-Risk (CMAR) services for Renew Jordan Creek - Main to Boonville (2019PW0073). The requested services include pre-construction CMAR services. Critical dates and timelines for CMAR selection are below: October 12, 2020 The method of contractor selection has not been determined at this time. The proposed project comprises two large blocks in the urbanized center of Jordan Valley Park, bordered on the east by Boonville Avenue, Water Street on the south, Main Street on the west, and Mill Street on the north. Much of the project area is within Federal Emergency Management Agency (FEMA) floodplain within downtown Springfield, Missouri. The work involves significant modifications to existing floodplain and floodway areas along Jordan Creek and may entail daylighting portions of Jordan Creek currently confined within the existing concrete box culverts. The overall project area is depicted on Exhibit A and includes a section of existing Jordan Creek box culverts through downtown from N. Main Ave. to N. Boonville Ave. The project is bounded by two existing planned Capital Improvement Projects: (1) the N. Main Ave. Bridge (2017PW0018, Exhibit B) on the western limits of the project area, and (2) the Jordan Creek Box Culvert Segment at IDEA Commons (2018PW0022, Exhibit C) on the eastern limits of the project area. These two projects are so closely connected with this project that the construction will be combined under one contract to realize efficiencies in construction and flexibility in scheduling and therefore shall be included in the CMAR’s scope of work for this project.

Conceptual

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
347
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2020

October 3, 2022

img_map_placeholder

Multiple Locations, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.